Case Study_ Improving real-time stage forecasting Muskingum model by incorporating the Rating Curve Model.
Barbetta S., Moramarco T., Franchini M., Melone F., Brocca L., Singh V.P., 2011, Case Study_ Improving real-time stage forecasting Muskingum model by incorporating the Rating Curve Model.,
Journal of hydrologic engineering 16 (2011).,
URL: http://www.cnr.it/prodotto/i/41697
Data from https://intranet.cnr.it/people/