CNR
Share

Contracts and agreements

Filters

30 contracts found

Order by

Studio e monitoraggio dei processi idrologici

From 01/01/2016 to 31/12/2020

Background L’IRPI è da molti anni impegnato nel monitoraggio di variabili idrologiche (umidità del suolo, pioggia, portata e velocità dei corsi d’acqua) che è risultato fondamentale per la rappresentazione del…

Hydrological monitoring and prediction of shallow landslides through remote sensing observations

Background Rainfall-induced shallow landslides and floods are the most common and dangerous natural hazards, mainly due to their high temporal frequency, which causes fatalities and high economic damage worldwide. Climate…

Hydrogeological study for the risk analysis of a landfill.

From 23/05/2014 to 23/07/2018

Background The company “Progetto Gestione Bacino Bari Cinque srl” has entrusted at the Research Institute for Geo-Hydrological Protection of the CNR the “Hydrogeological study for the risk analysis of the…

Partenariato di studio e documentazione a supporto dell’attività legislativa sugli Obiettivi di Sviluppo Sostenibile e focus sul geoscambio termico

From 01/11/2018 to 31/10/2020

Background The topic of low geothermal enthalpy is crucial as a strategy to mitigate and adapt to climate change. With this in mind, the structuring of environmental knowledge and information…

Geological investigations in the catchment of the Rio Kortol

From 13/12/2017 to 12/12/2018

Background Past debris flows in the Rio Kortol catchment arise concerns for the safety of the village of Sauris di Sotto, and urge new studies for the assessment of hazard…

Qualitative and quantitative degradation risks of water resources and effects on human activities

From 01/01/2016 to 31/12/2018

Background The research topics involve the consideration of geological, geomorphological, hydrological, hydrogeological, and technology and the use of innovative methodologies to achieve the sustainability of the natural balance inherent inland…

Flood forecasting and hydraulic risk

From 01/01/2016 to 31/12/2020

Background The project is focused on flood forecasting and hydraulic risk, i.e. the assessment of the effects of flooding in flood-prone areas also involving the vulnerability assessment of the hydraulic…

Kinematic of debris flows using Large Scale Particle Image Velocimetry (LSPIV)

From 06/02/2015 to 15/01/2016

Background Usually the video cameras installed within a debris-flow monitoring site have the role of recording videos to better understand the behavior of the event for an improved interpretation of…

Geomorphometry and sediment dynamics in mountain catchments

From 01/01/2016 to 31/12/2021

Background The aim of the geomorphometric analysis is to derive indices capable of characterizing the spatial variability of specific hydro-geomorphological processes (e.g., sediment connectivity, erosion and deposit). The growing availability…

Methodologies for the analysis of alluvial fans

From 29/12/2014 to 29/12/2015

Background Some areas mapped in the Piani di Assetto Idrogeologico (Watershed Management Plan) of Piave, Brenta-Bacchiglione and Livenza Rivers require specific studies aimed at assigning a degree of hazard. Among…

Mappatura, Modellazione e Previsione Multiscala dei RIschi GEo-idroLogici

From 01/01/2016 to 31/12/2018

Background Italy has a tradition of scientific research and technological development on hazardous natural phenomena in general, and specifically on geo-hydrological hazards. Within the CNR, the “Progetti Finalizzati”  Soil Conservation and Geodynamics…

Siccità E Cambiamenti cLImatici

From 01/01/2009 to 01/01/2013

Background SECLI Project is aimed to assess the combined effects of processes related to natural and anthropogenic climate change on water resources, both surface and groundwater, in the Umbrian territory,…

Dynamic flooding scenarios

From 01/01/2009 to 01/01/2013

Background The project activities were carried out in two phases: “dynamic scenarios of flood risk” identification through hydrologic-hydraulic modeling addressed to Civil Protection activities (2009-2011); operational implementation of developed dynamic…

Flooding-prone areas delineation

From 01/01/2009 to 01/01/2013

Background The project activities were carried out in two phases: delineation of flooding-prone areas for many river reaches selected in the secondary hydrographic network of Tiber River basin (2009-2011); analysis…

Analysis, control and hydro-meteorological data processing – Rating curve estimate

From 01/01/2002 to 01/01/2015

Background The activities of the project concerns the analysis and processing of hydro-meteorological data collected by the monitoring network of the Umbria Region for the period 1994-2014. In particular, the…